The fifth transmission pipeline project phase 2 in Thailand
Project owner: PTT Public Company Limited
Pipe size: 42inch Wall thickness: 20.6mm and 25.4mm
Deping’s equipment: internal line up clamp and pipe facing machine
The fifth transmission pipeline project phase 2 in Thailand
Project owner: PTT Public Company Limited
Pipe size: 42inch Wall thickness: 20.6mm and 25.4mm
Deping’s equipment: internal line up clamp and pipe facing machine
Copyright 2019@ Luoyang Deping Technology Co., Ltd. ALL Rights ReservedDesigned and Developed by www.hoogege.com